Mirage OM7 Technical Information Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
Installing the Cypres processing unit
(Also see the Cypres installation manual)
For installation, the processing unit is placed into a
specially bolstered and labeled nylon pocket which is
pre-installed in every Mirage reserve container.
Excess cable is stowed in the flat part of the pocket
underneath the velcro-adjustable flap. If you have to
stow both the thinner EOS cable and the thicker cable
to the control unit, be sure to place the thicker cable so
that it lays on top of the thinner one. [Fig. 2]
Installing the EOS and Cypres Control Unit
Feed the EOS and Control unit through the opening up
the built in channel in the reserve pack tray.
The EOS cable is routed through the small slit on the #1
closing flap and into the Cypres channel. Secure the
EOS using the elastic keeper. Insert the control unit into
either optional control unit transparent pouch. Mirage
offers both backpad window or transparent pouch on #6
closing flap. [Fig. 3]
TOOL LIST
1. Complete Mirage packing data card
2. Lead seal, press, and thread
3. Cypres loop, washer, and silicon
4. Bodkin/T-bar
5. Long pull up cord
6. Temporary pin
7. Temporary pile velcro tabs
8. Leverage Bar or Packing Paddle [Fig. 1]
Helpful Hint: Count and keep track of your tools!
Packing the Reserve Container
Fig. 1
Fig. 2
Fig. 3
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 39 40

Comments to this Manuals

No comments