Mirage OM7 Technical Information Page 31

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 30
Proper Bridle Routing for Main Container
Proper routing of the main bridle for standard right-
handed main deployment [Fig. 1]. Note that the bridle
passes from the right of the container, to the pin, and
back out to the right. It does not cross over the #2 flap.
IMPORTANT: Do not cross the main bridle from left
side to right side of the main pin cover flap, as this may
cause a slow deployment or a main pilot chute in tow
[Fig. 2]. The bridle must be routed on the same side of
the main pin cover as the bridle is routed into the main
pilot chute pouch.
Fig. 1
Fig. 2
Incorrect routing
Page view 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 39 40

Comments to this Manuals

No comments